Actions

Rudarstvo i geologija danas
how to cite this article
share this article

Metrics

  • citations in Portal: 0
  • citations in CrossRef:0
  • citations in Google Scholar:[]
  • visits in previous 30 days:0
  • full-text downloads in 30 days:0

Contents

article: 1 from 2  
Back back to result list
2024, Papers, pp. 166-173
Comparison between different methods for room and pillar design in underground hard rock mining
(The title is not available in English)
aUniverzitet u Prištini sa privremenim sedištem u Kosovskoj Mitrovici, Fakultet tehničkih nauka, Srbija
bRudarski institut, Beograd-Zemun, Srbija
cUniverzitet u Novom Sadu, Tehnički fakultet 'Mihajlo Pupin', Zrenjanin, Srbija
dMBV Mineros d.o.o. Paskovac
eOzz Leska, Dobrić

emailognjen.popovic@ribeograd.ac.rs
Project:
Ministarstvo nauke, tehnološkog razvoja i inovacija Republike Srbije (institucija: Univerzitet u Prištini sa privremenim sedištem u Kosovskoj Mitrovici, Fakultet tehničkih nauka) (MPNTR - 451-03-68/2020-14/200155)

Keywords: a mine using room; pillar mining method; hard rock
Abstract
(not available in English)
Designing a mine using room and pillar mining method (R&P) represents complicated task. Choosing the dimensions of pillar is a very sensitive subject, since it is directly connected with room stability and exploitation factor of ore body, because some part of ore body stays in pillars. This paper will compare multiple ways to correctly calculate dimensions of pillar and rooms, so that room stability wouldn't be endangered and, at the same time, to excavate as much ore body as possible, to enhance efficiency.

About

article language: engleski
document type: stručni članak
DOI: 10.5937/RGD240015J
published in Portal: 03.12.2024.
Creative Commons License 4.0

Related records

No related records

Sustainable Development Goals (SDG)

Top SDG Classifications

  • Život na zemlji (25%)

  • Odgovorna potrošnja i proizvodnja (21%)

  • Industrija, inovacije i infrastruktura (12%)

Goals Description