2024, Related fields: mechanical engineering, civil engineering, architecture, electronics, informatics, management, etc., pp. 419-422
Temporary river reinforced concrete crossing structure across the new Mušnica riverbed
(The title is not available in English)
Project:
Ministarstvo nauke, tehnološkog razvoja i inovacija Republike Srbije (institucija: Institut za rudarstvo i metalurgiju, Bor) (MPNTR - 451-03-68/2020-14/200052)

Keywords: Gacko surface coal mine; external transport of waste and overburden; Mušnica river; temporary crossing structure
Abstract
(not available in English)
The continuous transport of overburden and waste from the open pit mine across the newly built Mušnica riverbed is possible only in the case of construction a new bridge with a load capacity of over 300 t. Given the fact that the process of geological research, design, construction and commissioning requires a long period of time, the solution of building a new temporary reinforced concrete crossing of the assembly-disassembly type was chosen. The crossing will be used in the dry period of the year and will be built on the site of a temporary mine road until the permanent solution of the new bridge structure.

About

article language: engleski
document type: izvorni naučni članak
DOI: 10.5937/IOC24419Z
published in Portal: 01.04.2025.
Creative Commons License 4.0

Related records

No related records

Sustainable Development Goals (SDG)

Top SDG Classifications

  • Održivi gradovi i zajednice (58%)

  • Industrija, inovacije i infrastruktura (11%)

  • Život na zemlji (6%)

Goals Description