Akcije

Proceeding of scientific-expert Conference on Railway Railcon '24
kako citirati ovaj članak
podeli ovaj članak

Metrika

  • citati na Portalu: 0
  • citati u CrossRef-u:0
  • citati u Google Scholaru:[]
  • posete u poslednjih 30 dana:7
  • preuzimanja u poslednjih 30 dana:0

Sadržaj

članak: 3 od 11  
Back povratak na rezultate
Discussion of different topologies for station Resnik
(naslov ne postoji na srpskom)
OpenTrack Railway Technology GmbH, Vienna, Austria

e-adresaandreas.schoebel@opentrack.at
Ključne reči: railway planning; railway station layout; infrastructure design; simulation
Sažetak
(ne postoji na srpskom)
The planned redesign of station Resnik in the south of Belgrade is a good example of questions popping up for the future track topology. Of course, it strongly depends on the traffic forecast and the planned timetable. The challenge is to find a solution which offers a high utilisation of station tracks but also some reserves for future demand. Thereby, operational conflicts should be minimised by the layout itself. Looking at the costs of such a measure, one half is the investment and the other half is the maintenance during the life cycle. Therefore, too many tracks and switches will require more maintenance than less infrastructure assets. In this paper several solutions will be presented and discussed upon their advantages and disadvantages.

O članku

jezik rada: engleski
vrsta rada: izvorni naučni članak
DOI: 10.5937/Railcon24043S
objavljen na Portalu: 24.11.2024.
Creative Commons License 4.0

Povezani članci

Nema povezanih članaka

Ciljevi održivog razvoja (SDG)

Glavne SDG klasifikacije

  • Industrija, inovacije i infrastruktura (58%)

  • Odgovorna potrošnja i proizvodnja (23%)

  • Dostojanstven rad i ekonomski rast (10%)

Opis Ciljeva